a new way

to secure your facade

Clip Clamps

Our new Clip Clamp now joins our existing mechanical fixing systems for mixed cladding facades. This anchor model ensures faster installations thanks to its installation and placement process.

This model is suitable for installing fixing systems that you want to conceal and is recommended for pieces with a thickness of 6 mm or more.

A faster installation

The new Clip Clamp makes it easier to install mixed cladding façades. Simply make a groove in the tile with a cutting tool, fit the clamp and perform double bonding. Additionally, the use of a knock-in plug speeds up installation so it takes less time.

Made in stainless steel according to UNE-EN 10088-2 standard.

Hidden installation

Fast installation

One key feature of this piece is its double tab, which increases the clamp’s grip on the tile and strengthens its hold.

Another advantage of this anchor is that you can choose the desired joint thickness as required and combine it with the corresponding levelling system and/or spacers.

Mode of use

1. Measure and assemble the start anchors.

We use Start Clamps placed flush as the basis for all the slabs in the lower part. Exposing the slab, we measure the position of the top clamps, where we will use the Intermediate Clamp.

2. Glue the part and fasten it with intermediate anchors.

Once the spot where the anchors are to be installed, drill the wall for the plug and the screw. Glue the area and screw the Clamps with the slab in place.

2. Glue the part and fasten it with intermediate anchors.

Once the spot where the anchors are to be installed, drill the wall for the plug and the screw. Glue the area and screw the Clamps with the slab in place.

3. Complete the lower row fully.

Follow the same installation process for all the slabs in the lower part. The Intermediate Clamp fastens the lower slabs and leaves a gripping point for the upper ones.

4. Repeat the process with intermediate anchors.

Move to the second row of the façade and repeat the same steps, this time only with the Intermediate Clamp.

2. Glue the part and fasten it with intermediate anchors.

Once the spot where the anchors are to be installed, drill the wall for the plug and the screw. Glue the area and screw the Clamps with the slab in place.

Subscribe to our newsletter< wpml_linebreak > and don't miss a thing

Find out first-hand about all our news, events and new training courses

Please enable JavaScript in your browser to complete this form.

Shall we talk?

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.